Legasea

Nov 19, 20191 min

Six Months of Growth

Updated: May 16, 2022

The last six months have been incredible!

The team at Legasea has now undertaken a wide range of projects, including:

• Function Testing / Pressure Testing of Drilling Tools
 
• Flushing and Testing of Umbilical’s
 
• Inspection and Storage of Controls System Hardware
 
• Subsea Xmas Tree Disassembly
 
• Refurbishment of Transit Skids
 
• Subsea Controls Interface Testing

We are immensely grateful for our amazing clients and supply chain, as well as McIntosh Plant Hire, all of which have been incredibly supportive in helping us to get our company off to a flying start!

    210
    0